Follow
Zhenjin Zhu
Zhenjin Zhu
Verified email at alumni.utoronto.ca
Title
Cited by
Cited by
Year
A numerical study of under-deposit pitting corrosion in sour petroleum pipelines
Z Zhu, KW Sand, PJ Teevens
152010
A mechanistic model for predicting localized pitting corrosion in a brine water-CO2 system
Z Zhu, N Tajallipour, PJ Teevens, H Xue, FYF Cheng
NACE CORROSION, NACE-11256, 2011
132011
CFD based analysis of multiphase flows in bends of large diameter pipelines
R Khaksarfard, M Paraschivoiu, Z Zhu, N Tajallipour, PJ Teevens
NACE CORROSION, NACE-2013-2480, 2013
112013
Internal Pitting Corrosion of X80 Pipeline Steel Under Deposited Sand Bed In CO2-Saturated Solutions
H Xue, FY Cheng, Z Zhu, N Tajallipour, PJ Teevens
NACE CORROSION, NACE-11264, 2011
102011
Effect of loss of blowing agents on thermal insulation properties of polystyrene foams
Z Zhu, JH Zong, CB Park, M Choudhary
102009
Modeling of elemental sulfur deposition in sour-gas petroleum pipelines
Z Zhu, N Tajallipour, PJ Teevens, P Eng, K Lepková, R Gubner
NACE CORROSION, NACE-11124, 2011
72011
Solids deposition in liquids petroleum (oil) and wet-gas pipelines for internal corrosion predictive modelling ICPM
Z Zhu, KW Sand, PJ Teevens
72010
Liquid Petroleum-Internal Corrosion Direct Assessment (LP-ICDA) of a
AW Al-Mithin, S Safri, S Prakash, P Teevens, Z Zhu, A Khera
Piggable” Kuwaiti Crude Oil Pipeline Using NACE International SP0208-2008 …, 2012
6*2012
Study on chromium existence and distribution in a 300MW pulverized coal fired utility boiler
Z Zhenjin, T Yi, Z Jian
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 23 (4), 167-171, 2003
62003
Parametric study of solids deposition in a heavy-oil transmission pipeline
N Tajallipour, Z Zhu, PJ Teevens, T Place
NACE CORROSION, NACE-2012-1679, 2012
52012
Studies on cold modeling theory of furnace in tangential firing system
Z Zhen-jin, Z Chang-Lu
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 21 (5), 47-50, 2001
52001
Sulphate-reducing bacteria growth kinetics'-based microbiologically influenced corrosion predictive model.
T Haile, P Teevens, Z Zhu
Journal of Pipeline Engineering 14 (4), 2015
42015
The Effect of Slug Liquid Front on Inhibitor Effectiveness in Petroleum Pipelines
N Tajallipour, Z Zhu, PJ Teevens
NACE CORROSION, NACE-11275, 2011
42011
Numerical simulation and experimental verification of pitting corrosion propagation in sweet pipeline service
Z Zhu, PJ Teevens, H Xue, YF Cheng
Journal of Pipeline Science and Engineering 2 (1), 78-86, 2022
32022
Liquid Petroleum–Internal Corrosion Direct Assessment (LP-ICDA) of Three ‘Non-Piggable Gravity’Crude Oil Export Pipelines in Kuwait Oil Company using SP0208-2008
AW Al-Mithin, S Safri, A Salam, P Teevens, Z Zhu, A Khera
14th Middle East Corrosion Conference and Exhibition, paper, 19, 2012
32012
Effects Of Flow Regime On Solids Deposition In Multiphase Petroleum Flow
Z Zhu, KW Sand, PJ Teevens
NACE CORROSION, NACE-10384, 2010
32010
Solid deposition in liquids petroleum (oil) and wet-gas pipelines for internal corrosion predictive modeling (ICPM)
Z Zhenjin, W Keith, JT Patrick
NACE Northern Area Western Conference (Houston, TX: NACE, 2010), 2010
32010
Cold model tests of a new technique on eliminating residual rotation at furnace outlet of tangential firing system
Z Zhenjin, Z Changlu, F Zhicheng
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 22 (2), 59-63, 2002
32002
Internal Corrosion Direct Assessment of a High-Pressure Wet-Gas Pipeline Using NACE SP0110
PJ Teevens, Z Zhu, A Khera, S Al-Sulaiman, A AL-Jasmi, S Prakash
NACE CORROSION, NACE-2013-2634, 2013
22013
Two Contrasting Internal Corrosion Scenarios Assessed by Liquid Petroleum–Internal Corrosion Direct Assessment (LP-ICDA) for the Innovative Development of a Dynamic Pitting Factor
PJ Teevens, Z Zhu, A Khera, AW Al-Mithin, S Safri
International Pipeline Conference 45134, 369-378, 2012
22012
The system can't perform the operation now. Try again later.
Articles 1–20