Sustainable refurbishment for school buildings: a literature review ATH Le, KS Park, N Domingo, E Rasheed, N Mithraratne International Journal of Building Pathology and Adaptation 39 (1), 5-19, 2021 | 57 | 2021 |
The productivity paradox in green buildings H Byrd, EO Rasheed Sustainability 8 (4), 347, 2016 | 51 | 2016 |
Can self-evaluation measure the effect of IEQ on productivity? A review of literature EO Rasheed, H Byrd Facilities 35 (11/12), 601-621, 2017 | 49 | 2017 |
Does the number of occupants in an office influence individual perceptions of comfort and productivity?—new evidence from 5000 office workers EO Rasheed, M Khoshbakht, G Baird Buildings 9 (3), 73, 2019 | 45 | 2019 |
Total quality management practices in large construction companies: A case of Oman A Bakar, KB Ali, E Onyeizu World Applied Sciences Journal 15 (2), 285-296, 2011 | 40 | 2011 |
Time spent in the office and workers’ productivity, comfort and health: A perception study EO Rasheed, M Khoshbakht, G Baird Building and Environment 195, 107747, 2021 | 37 | 2021 |
The influence of work group size and space sharing on the perceived productivity, overall comfort and health of occupants in commercial and academic buildings M Khoshbakht, G Baird, EO Rasheed Indoor and Built Environment 30 (5), 692-710, 2021 | 32 | 2021 |
The utilisation of inustrialised building system in design innovation in construction industry EN Onyeizu, A Hassan, A Bakar Applied Sciences 15 (2), 205-213, 2011 | 30 | 2011 |
Building maintenance cost planning and estimating: A literature review ATH Le, N Domingo, E Rasheed, KS Park Proceedings of the 34th Annual ARCOM Conference, ARCOM, 697-706, 2018 | 25 | 2018 |
Influence of key role players on productivity outcomes in the residential building lifecycle J Mbachu, T Egbelakin, EO Rasheed, WM Shahzad Journal of Engineering, Design and Technology 15 (4), 528-551, 2017 | 23 | 2017 |
Why are naturally ventilated office spaces not popular in New Zealand? EO Rasheed, H Byrd, B Money, J Mbachu, T Egbelakin Sustainability 9 (6), 902, 2017 | 23 | 2017 |
EVALUATING RISK MANAGEMENT PRACTICES IN CONSTRUCTION INDUSTRY: EVIDENCE FROM OMAN. AHB Abu Bakar, K Ali, EN Onyeizu, MN Yusof International Journal of Academic Research 4 (2), 2012 | 21 | 2012 |
Can a naturally ventilated office outperform a mixed mode office? Pilot study on occupants' comfort EO Rasheed, H Byrd Building and Environment 137, 34-40, 2018 | 18 | 2018 |
Modelling of underlying social psychological effects on occupant energy-related behaviours AS Weerasinghe, JOB Rotimi, EO Rasheed Building and Environment 231, 110055, 2023 | 17 | 2023 |
Office distractions and the productivity of building users: The effect of workgroup sizes and demographic characteristics M Khoshbakht, EO Rasheed, G Baird Buildings 11 (2), 55, 2021 | 15 | 2021 |
Maturity model of building maintenance management for New Zealand’s state schools ATH Le, N Domingo, E Rasheed, K Park Building Research & Information 50 (4), 438-451, 2022 | 13 | 2022 |
Does leadership style differ between a post-disaster and non-disaster response project? A study of three major projects in New Zealand F Witton, EO Rasheed, JOB Rotimi Buildings 9 (9), 195, 2019 | 12 | 2019 |
The delusion of green certification: The case of New Zealand green office buildings E Onyeizu Proceedings of the 4th New Zealand Built Environment Research Symposium …, 2014 | 12 | 2014 |
Can architecture increase productivity? The case of green certified buildings E Onyeizu PhD Thesis-University of Auckland, 2014 | 12 | 2014 |
Strategic collaboration in managing existing buildings in New Zealand's state schools: school managers' perspectives ATH Le, N Domingo, E Rasheed, K Park Construction management and economics 40 (3), 173-185, 2022 | 10 | 2022 |